ITBNG

contact us
Office Locations

We usually respond within 24 hours. Alternateively you’re welcome to call our offices.

Head Office​

28th FLOOR, AZURI OFFICE TOWER, MARINA DISTRICT, EKO ATLANTIC CITY, LAGOS, NIGERIA. + 234 1 4638303

Branch Office

ABUJA: MPAPE JUNCTION, KUBWA-SULEJA EXPRESSWAY, ABUJA +234 9 4137101

Branch Office
RUE 1886, COTONOU, BENIN, BJ +229 51030000
Date of AwardFebruary 18, 1996
Prime ConsultantDepartment of Public Building FCDA, Abuja
Project Duration30 Months
RemarkCompleted

The National Assembly Complex

The National Assembly Complex is located in the Three Arm Zone of the Federal Capital Territory Abuja. With its distinctive features and dome shaped roof, it is one of the architectural landmarks in the Nigeria capital city of Abuja.

The National Assembly Complex consists of 40,000m² gross floor area of concrete structure for both the legislative and senatorial arm of the National Assembly. The complex has two chambers which is serviced by a central atrium.

The extremely short construction period (30 months), made it necessary for ITB Nigeria Limited to develop a construction system to meet the project deadline. The structural element was therefore a combination of insituconcrete and precast elements. The internal partitions are in plastered and painted concrete block walls, with high quality profile aluminium glazed windows and doors.

The ceiling is finished with acoustic suspended ceiling type while the floor is finished with a combination of vitrified tiles, marble tiles and granite tiles. The state-of-the-art mechanical and electrical installation includes a central air-conditioning system, fire fighting and fire detection system, CCTV, access control systems and standby generators.