ITBNG

contact us
Office Locations

We usually respond within 24 hours. Alternateively you’re welcome to call our offices.

Head Office​

28th FLOOR, AZURI OFFICE TOWER, MARINA DISTRICT, EKO ATLANTIC CITY, LAGOS, NIGERIA. + 234 1 4638303

Branch Office

ABUJA: MPAPE JUNCTION, KUBWA-SULEJA EXPRESSWAY, ABUJA +234 9 4137101

Branch Office
RUE 1886, COTONOU, BENIN, BJ +229 51030000
Date of AwardJune, 2018
Prime ConsultantDangote Refinery
Project Duration35 Months
RemarkCompleted

Dangote Oil Refinery Company

CIVIL WORKS AT DANGOTE SITE:

ITB Civil works in the Dangote Refinery site comprises sub-structural civil works in two locations: CPP (Crude Processing Plant) and CDU (Crude Distillation Unit).

1. CPP is mainly the civil works of the sub-station, control rooms, cooling tower, steam turbine generating unit, and gasoline area – Total Area = 78,000 m2

2. CDU works includes construction of sumps and valves; these are mainly concrete structures with metal inserts – Total Area = 9,200 m2

LIFE CAMP AT DANGOTE SITE:

The accommodation buildings are made of modular steel frame, fire and acoustic guides, structural member sizing tools, wind loading and quality assurance procedures.

ITB participated partially in the construction of 22,000 men housing camp and now awarded the full construction of the 10,000man housing camp

Dangote Oil Refinery Company